Current Construction

Phase 3A

The stabilization of the east wall and the rebuilding of all the stage floors are complete. The massive structural-steel cage that will support the stage rigging, lights, and curtains has also been installed and is illustrated in the photos above.

updated 10.21.08

East wall exterior stabilized